CASCADE COPPER REPORTS CHANNEL SAMPLE RESULTSFROM THE CENTREFIRE COPPER-GOLD PROJECT Highlights include 0.82% Cu, 1.168 g/t Au, and 6.640 g/t Ag over 5.0m.
• Results from the seven high priority channel sample composites confirm copper, gold, and silver mineralization on the Main Gossan Zone. • Consistent mineralization exposed along a 60m section of an 850m long EM conductor.• • In addition to copper values, the gold and silver assays are significant Vancouver, British